10 COMMISSIONING
10.2 TEST EQUIPMENT
It is possible to completely verify the 745 relay operation using the built-in test and simulation features
described earlier in this manual. However, some customers prefer to perform simple signal-injection tests to
verify the basic operation of each element placed into service. The procedures described in this chapter have
been designed for this purpose. To use the built-in facilities, refer to the appropriate sections in this manual.
The conventional, decades-old approach to testing relays utilized adjustable voltage and current sources, vari-
acs, phase shifters, multimeters, timing device, and the like. In the last few years several instrumentation com-
panies have offered sophisticated instrumentation to test protective relays. Generally this equipment offers
built-in sources of AC voltage and current, DC voltage and current, timing circuit, variable frequency, phase
shifting, harmonic generation, and complex fault simulation. If using such a test set, refer to the equipment
manufacturer's instructions to generate the appropriate signals required by the procedures in this section. If
you do not have a sophisticated test set, then you will need the following "conventional" equipment:
Variable current source able to supply up to 40 A (depends on relay settings)
Variable power resistors to control current amplitude
Ten-turn 2 KΩ low-power potentiometer
Power rectifier to build a circuit to generate 2nd harmonics
Accurate timing device
Double-pole single-throw contactor suitable for at least 40 amperes AC.
Combined fundamental & 5th-harmonic adjustable current supply for elements involving the 5
Variable-frequency source of current or voltage to test over/underfrequency and frequency trend elements.
Ammeters (RMS-responding), multimeters, voltmeters
variable dc mA source
variable dc mV source
single-pole single-throw contactor
The simple test setup shown below can be used for the majority of tests. When the diode is not shorted and the
two currents are summed together prior to the switch, the composite current contains the 2
nd
sary to verify the 2
harmonic restraint of the harmonic restraint percent differential elements. With the diode
shorted and the two currents fed to separate relay inputs, the slope of the differential elements can be mea-
sured. With only I
connected (with a return path) the pickup level of any element can be measured.
1
GE Power Management
Figure 10–1: TEST SETUP
745 Transformer Management Relay
10.2 TEST EQUIPMENT

10.2.1 TEST SETUP

th
harmonic.
nd
harmonic neces-
10-3
10