General Fiber Management - Alcatel-Lucent 1675 LambdaUnite Installation And System Turn-Up Manual

Multiservice switch (mss)
Table of Contents

Advertisement

System cabling and final assembly

General fiber management

All fiber cables must be routed within the front half of the 1675 LambdaUnite MSS
rack frame and from both sides of the subrack to the top or bottom via the side guides
(DC1001518, item 2) which are mounted at each corner position of the subrack. The
cables are tightened with Velcro tape (DC1005002, item 3) before they enter the
subrack.
Cables are routed to the slot position via the fiber guides (RT/LB) (DC1001516, item
1) or the fiber guides (LT/RB) (DC1001517, item 4) which are mounted on the
top/bottom of the subrack.
Figure 4-65 General fiber management
....................................................................................................................................................................................................................................
365-374-179R10.0
Issue 2, June 2009
Alcatel-Lucent - Proprietary
See notice on first page
Fiber engineering rules
4-91

Advertisement

Table of Contents
loading

Table of Contents