Leuze electronic BPS 8 Original Operating Instructions page 52

Bar code positioning system
Table of Contents

Advertisement

Connecting the functional earth FE
CAUTION
Connect functional earth!
 Ensure that the functional earth (FE) is connected correctly.
Fault-free operation is only guaranteed if the functional earth is connected properly.
• BPS 8 with cable (option) and open cable end:
- Use shielded cables (see chapter 12.5 "Accessories – Cables").
- Connect the shield in the switch cabinet to FE (functional earth).
- The BPS 8 is usually connected to an earthed steel structure (PE). To prevent com-
pensating currents, FE and PE must be configured for potential equalization.
• BPS 8 connected via MA 8...:
- Use shielded cables (see chapter 12.5 "Accessories – Cables").
- Connect PIN 5 of MA 8 PWR connection cable to FE.
- The BPS 8 is usually connected to an earthed steel structure (PE). To prevent com-
pensating currents, FE and PE must be configured for potential equalization.
Cable lengths and shielding
The following maximum cable lengths and shielding types must be observed:
Connection
BPS 8 - Service
BPS 8/MA 8... - Host
Switching input
Switching output
Leuze electronic
Interface
Max. cable length
RS 232
RS 485
BPS 8
Electrical connection
Shielding
10 m
Absolutely required,
sheath of a shielded line
25 m
Absolutely required, shielded
10 m
Not necessary
10 m
Not necessary
50

Advertisement

Table of Contents
loading

Table of Contents