Installation Menu; Tanks: Instructions For Filling And Draining - Euronda E9 Next 18L Instruction Manual

Table of Contents

Advertisement

The first time that the unit is turned on using the ON-OFF button, the LCD screen comes on and shows the
following welcome message. This message stays on the screen for a few seconds, until the machine is ready
to be used. After a few seconds, required to load the process controller, the language selection screen will
appear. After selecting the language, the installation screen will appear.
Touch this icon to confirm the installation of the unit, the date and the time displayed on the
screen.
Touch this icon to exit the unit installation procedure. The installation screen will appear again the
next time the unit is switched on.
6.7
The unit features two separate tanks: one for the clean water required for the cycles, and one for the used
water that is collected at the end of the cycles. Both tanks are connected with drain valves.
Filling with distilled water for the first time
1. If a cycle is run and the water in the clean water tank does not reach the minimum level, the following icon
appears on the display:
2. Open the plug in the upper cover, fit the supplied funnel into the hole (1 in Fig. 6.8-1) and pour in a
quantity of distilled water as indicated in chap. 5.3 "Technical data"; never exceed the level indicated with
the word MAX in the water filling hole. Water can also be poured in through the deionizer (optional,
Appendix 10). To install this optional, consult the respective "Aquafilter" instruction manual supplied with
the deionizer.
6.6

INSTALLATION MENU

TANKS: INSTRUCTIONS FOR FILLING AND DRAINING

24
Aquafilter
E9 NEXT
E9_Next_Ing_rev03 – 10/10/2018

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Euronda E9 Next 18L

This manual is also suitable for:

E9 next seriesE9 next 24l

Table of Contents