VGW cascade mode of start and stop
cascade".
2.4 Installation check
In this step, we should check VGW device when power is on. But before this, you should
ensure cable connection and power connections are done by referring to the following steps:
Check the power indicator (PWR) whether is on or not. If so, it indicates that device's
power is ready, otherwise please check the connection of the power plug or power
adaptor.
When LAN or WAN port LED is blinking, it indicates that network is ready. Otherwise,
check network connection.
When device's (SYS) LED is blinking, at the same time when you pick up the phone
and the phone port LED is on. It proves telephone port is ready, otherwise check the
telephone connection.
4-/8-Port SIP Internet Telephony Gateway
,
See "4.1.1 WAN port configuration settings in
Page 10
VGW-x10 Series