2.2 Device installation
This chapter describes two common installation methods. After device's install spot is
selected, phone line, RJ45 cable and power cable must be connected.
2.2.1 Fixed to the plane
Put the VGW-x10 series on a clean, flat, steady bench top, and follow the steps below:
Ensure workplace is flat and stable.
Keep certain space for all sides of the device for heat dissipation.
Don't place anything on it.
2.3 Cable connection
2.3.1 Common connection
The downlink is made through LAN using RJ45 cable to connect with user PC, switch or hub,
while the uplink is made through WAN using RJ45 cable to connect with Ethernet (such as ONU)
or ADSL modem. RJ11 is used to connect user telephone and VGW's FXS port.
Before you push the power button, make sure that all cables have been connected.
It is strong recommended to use a neutral point power connector, which has a
single-phase three-wire power or multi-purpose PC power socket. In this case, power
has grounded outlet that assure operator's safety. Do not use extension cords.
2.3.2 Network topology graph
4-/8-Port SIP Internet Telephony Gateway
Figure 2-3-2 VGW-410FS Application chart
Page 8
VGW-x10 Series