Figure 68: Test of RTC with I/O
12.16

Basic IED functions

12.16.1

Parameter setting group handling SETGRPS

Prepare the IED for verification of settings as outlined in section
"Preparing for test"
12.16.1.1

Verifying the settings

1.
Check the configuration of binary inputs that control the selection of the active setting
group.
2.
Browse to the ActiveGroup menu to achieve information about the active setting group.
The ActiveGroup menu is located on the local HMI underMain menu/Test/Function
status/Setting groups/ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the IED and
observe the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting groups
are described in the corresponding PCM600 documents and instructions for the
operators within the SCS are included in the SCS documentation.
12.16.1.2

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
230
in this chapter.
1MRK 502 067-UEN B
SEMOD52026-1 v1
"Requirements"
and section
TestMode setting to Off .