Completing The Test; Pole Slip Protection Pspppam; Verifying The Settings - ABB RELION REG670 Commissioning Manual

Generator protection
Hide thumbs Also See for RELION REG670:
Table of Contents

Advertisement

1MRK 502 067-UEN B
If the input I0CHECK is configured (connected to output signal STPE on FDPSPDIS or
FRPSPDIS, the test of inhibit of ZMRPSB at earth-fault during power swing can be done in
the same way as for test of
TRSP is activated at the same time as the input I0CHECK during power swing.
12.4.9.5

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
12.4.10

Pole slip protection PSPPPAM

Prepare the IED for verification of settings as outlined in section
"Preparing for test"
12.4.10.1

Verifying the settings

It is assumed that setting of the pole slip protection function PSPPPAM is done according to
impedances as seen in figure
The test is done by means of injection of three-phase current and three-phase voltage from a
modern test device. This test device shall be able to give voltage and current with the
possibility to change voltage and current amplitude and the angle between the injected
voltage and current. The parameter setting shall be according to the real application chosen
values.
Procedure
1.
Feed the IED with current and voltage corresponding to a normal operation point
Injected voltage U equal to base voltage (
the base current (
2.
With maintained amplitude of the injected voltage the current amplitude and angle is
changed to a value ZC/2.
This is done with a speed so that the final impedance is reached after 1 second. As the
injected voltage is higher than 0.92
3.
With reduced amplitude of the injected voltage to 0.8
angle is changed to a value ZC/2.
This is done with a speed so that the final impedance is reached after 1 second. As the
injected voltage is lower than 0.92
4.
With reduced amplitude of the injected voltage to 0.8
angle is changed via ZC/2 to a value corresponding to half
injected current and voltage.
This is done with a speed so that the final impedance is reached after 1 second. As the
injected voltage is lower than 0.92
addition to this the signal ZONE1 should be activated.
5.
Set
Now the signals TRIP1 and TRIP should be activated.
6.
With reduced amplitude of the injected voltage to 0.8
angle is changed via ZC + (ZA – ZC)/2 to a value corresponding to half
between the injected current and voltage.
This is done with a speed so that the final impedance is reached after 1s. As the injected
voltage is lower than 0.92
the signal ZONE2 should be activated.
7.
Set
Now the signals TRIP2 and TRIP should be activated.
Commissioning manual
in this chapter.
48
IBase ). The angle between the voltage and current shall be 0°.
N1Limit to 1 and repeat step 4.
UBase the START signal should be activated. In addition to this
N2Limit to 1 and repeat step 6.
tR1 . The inhibit of ZMRPSB shall be instantaneous if the input
and figure 49.
UBase ) and the injected current I equal to half
UBase no START signal should be activated.
UBase the START signal should be activated.
UBase the START signal should be activated. In
Testing functionality by secondary injection
TestMode setting to Off .
"Requirements"
and section
UBase the current amplitude and
UBase the current amplitude and
IBase and 180° between the
UBase the current amplitude and
IBase and 180°
Section 12
M13888-99 v5
SEMOD175096-3 v2
SEMOD175096-7 v3
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents