1MRK 502 067-UEN B
WA1_QA1
(SESRSYN 1)
LINE1_QB9
IEC11000274 V3 EN-US
Figure 67: Objects used in the voltage selection logic
12.10.1.5

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
12.10.2

Apparatus control APC

The apparatus control function consists of four types of function blocks, which are connected
in a delivery-specific way between bays and to the station level. For that reason, test the total
function in a system, that is, either in a complete delivery system as an acceptance test (FAT/
SAT) or as parts of that system.
12.10.3

Tap changer control and supervision TCMYLTC, TCLYLTC

Prepare the IED for verification of settings as outlined in section
section
The automatic voltage control for tap changer, single control TR1ATCC is based on a
transformer configuration that consists of one tap changer on a single two-winding power
transformer.
Commissioning manual
TIE_QA1
(SESRSYN 2)
LINE1
If a block/unblock command is sent from remote to function, while the IED is
shut down, this command will not be recognized after the start up, thus the
command that was sent prior to the shut down is used. In such cases, where
there is a mismatch, the user is advised to make a complete cycle of block/
unblock operations to align the statuses.
"Preparing for test"
in this chapter.
Testing functionality by secondary injection
WA1
WA2
WA2_QA1
(SESRSYN 3)
LINE2_QB9
LINE2
IEC11000274-3-en.vsd
Section 12
TestMode setting to Off .
SEMOD175185-3 v12
"Requirements"
and
M2377-1042 v5
M13385-2 v4
211