Connecting The Test Equipment To The Ied; Releasing The Function To Be Tested - ABB RELION REG670 Commissioning Manual

Generator protection
Hide thumbs Also See for RELION REG670:
Table of Contents

Advertisement

Section 11
Testing IED operation
11.4

Connecting the test equipment to the IED

Connect the test equipment according to the IED specific connection diagram and the needed
input and output signals for the function under test. An example of a connection is shown in
figure 30.
Connect the current and voltage terminals. Pay attention to the current polarity. Make sure
that the connection of input and output current terminals and the connection of the residual
current conductor is correct. Check that the input and output logical signals in the logic
diagram for the function under test are connected to the corresponding binary inputs and
outputs of the IED under test.
IEC09000652 V1 EN-US
Figure 30: Connection example of the test equipment to the IED when test equipment is
11.5

Releasing the function to be tested

Release or unblock the function to be tested. This is done to ensure that only the function or
the chain of functions to be tested are in operation and that other functions are prevented
from operating. Release the tested function(s) by setting the corresponding
parameter under Function test modes to
When testing a function in this blocking feature, remember that not only the actual function
must be activated, but the whole sequence of interconnected functions (from measuring
inputs to binary output contacts), including logic must be activated. Before starting a new test
mode session, scroll through every function to ensure that only the function to be tested (and
the interconnected ones) have the parameters
Yes respectively. Remember that a function is also blocked if the BLOCK input signal on the
corresponding function block is active, which depends on the configuration. Ensure that the
logical status of the BLOCK input signal is equal to 0 for the function to be tested. Event
88
To ensure correct results, make sure that the IED as well as the test equipment
are properly earthed before testing.
IL1
IL2
IL3
IN
UL1
UL2
UL3
UN
IEC 61850
connected to the transformer input module
IL1
IL2
IL3
IN (I4,I5)
UL1
UL2
UL3
UN
UN (U4,U5)
TRIP L1
TRIP L2
TRIP L3
IEC09000652-1-en.vsd
No in the local HMI.
Blocked and eventually EvDisable set to No and
1MRK 502 067-UEN B
M11744-2 v7
M11413-2 v6
Blocked
Commissioning manual