Section 12
Testing functionality by secondary injection
7.
After more than 5 seconds increase the measured voltage back to the value slightly below
USealIn level. MAINFUF signal should not reset.
8.
Slowly increase measured voltage to the value slightly above
resets.
9.
Record the measured voltage and compare with the set value
12.9.3.1

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
12.10

Control

12.10.1

Synchrocheck, energizing check, and synchronizing SESRSYN

This section contains instructions on how to test the synchrocheck, energizing check, and
synchronizing function SESRSYN for single, double and 1½ breaker arrangements.
Prepare the IED for verification of settings as outlined in section
section
At commissioning and periodical checks, the functions shall be tested with the used settings.
To test a specific function, it might be necessary to change some setting parameters, for
example:
AutoEnerg = Off / DLLB / DBLL / Both
ManEnerg = Off
Operation = Off / On
Activation of the voltage selection function if applicable
The tests explained in the test procedures below describe the settings, which can be used as
references during testing before the final settings are specified. After testing, restore the
equipment to the normal or desired settings.
A secondary injection test set with the possibility to alter the phase angle and amplitude of
the voltage is needed. The test set must also be able to generate different frequencies on
different outputs.
Figure
64
description describes the test of the version intended for one bay.
Figure
65
connected to the line side.
204
"Preparing for test"
in this chapter.
The description below applies for a system with a nominal frequency of 50 Hz
but can be directly applicable to 60 Hz. SESRSYN can be set to use different
phases, phase to earth or phase to phase. Use the set voltages instead of what
is indicated below.
shows the general test connection principle, which can be used during testing. This
shows the general test connection for a 1½ breaker diameter with one-phase voltage
1MRK 502 067-UEN B
USealIn until MAINFUF signal
USealIn .
GUID-38A57549-E6BF-46CB-ADFB-79305684EB67 v1
TestMode setting to Off .
SEMOD53560-1 v1
"Requirements"
and
Commissioning manual
M2377-3 v11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents