9. Detach each of the two power connectors near the power supplies:
a. Using a screwdriver, depress the two tabs on the connector.
b. Pull the connector toward the rear of the server and detach.
10. Detach the bundled power cable from the chassis:
a.
Pull the bundled power cable through the slot in the crossbar.
b. Slide the two power connectors through the opening on the side of the
server ( 3 ).
11. Remove the AC box assembly from the server.
12. To install the AC box assembly, reverse the above steps.
Note: When replacing the side panel:
a. Line up the tabs on the panel with the notches on the server, then
slide back.
b. Position the bundled cable towards the bottom of the panel before
securing the panel.
c. The screw nearest the rear of the server secures both the panel and
the AC box assembly mechanism.
FRU information (service only)
145