Two Speed Lowering; Synchronized Version (Option); Operation Instruction For Lifts In Tandem Lay-Out - stertil-KONI SKY-200 Installation, Operation And Maintenance Instructions

Hydraulic vehicle lift
Table of Contents

Advertisement

9.4

Two speed lowering

It is possible to select slow or fast lowering with the selector switch.
Figure 9.8 Control panel
For this option, program code 64 must be activated, see
features' on page
This option is not available for the synchronized version.
9.5

Synchronized version (option)

It is possible to use two lifts in synchronized operation.
By means of an additional switch you can select one or two lifts.

9.5.1 Operation instruction for lifts in tandem lay-out

Two lifts can be joined lengthwise to be able to lift long vehicles.
Figure 9.9 Tandem lay-out
Operation & maintenance instructions (Version H)
52.
86
Two speed lowering
4.7 'Programmable
SKY-200/250

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sky-250

Table of Contents