Rack Mounting - Extron electronics IP Link IPL T CR48 User Manual

Ethernet control interface
Hide thumbs Also See for IP Link IPL T CR48:
Table of Contents

Advertisement

2.
Reduced air flow
amount of air flow required for safe operation of the equipment is not compromised.
3.
Mechanical loading
hazardous condition is not achieved due to uneven mechanical loading.
4.
Circuit overloading
equipment to the supply circuit and the effect that overloading of the circuits might have
on overcurrent protection and supply wiring. Appropriate consideration of equipment
nameplate ratings should be used when addressing this concern.
5.
Reliable earthing (grounding)
be maintained. Particular attention should be given to supply connections other than
direct connections to the branch circuit (such as the use of power strips).

Rack Mounting

For optional rack mounting, mount the unit on an RSF 123 Rack Shelf (see figure 1) or an
RSU 129 Universal Rack Shelf (see figure 2).
RSF 123 Rack Shelf
1/4 Rack Width Front
False Faceplate
Use 2 mounting holes on
opposite corners.
Figure 1.
1U Universal Rack Shelf
Both front false faceplates
use 2 screws.
Use 2 mounting holes on
opposite corners.
Figure 2.
Installation of the equipment in a rack should be such that the
Mounting of the equipment in the rack should be such that a
Consideration should be given to the connection of the
Reliable earthing of rack-mounted equipment should
(2) 4-40 x 3/16"
Screws
Mounting the Unit on the RSF 123 Rack Shelf
1/2 Rack Width Front False
Faceplate
1/4 Rack Width Front False
Faceplate
(2) 4-40 x 3/16"
Screws
Mounting the Unit on the RSU 129 Universal Rack Shelf
IPL T CR48 • Installation and Operation
4

Advertisement

Table of Contents
loading

Table of Contents