Workflow - ABB RELION 615 Series Engineering Manual

Hide thumbs Also See for RELION 615 Series:
Table of Contents

Advertisement

1MAC108982-MB E
2.3
615 series ANSI
Engineering Manual

Workflow

Save the work
between the
different steps
DNP 3.0
Modbus
Signal engineering
GUID-400C23DB-E4D5-4DA6-86DB-07BC898E102A V1 EN
Figure 4:
Protection relay engineering workflow proposal based on practical
experience and dependencies of the steps
It is possible to follow a different sequence based on the information available at the time
when the project is started. This means that several iterations may be needed to complete
the project.
Start
Create plant structure and
insert IED objects
Project
ACT
Configure IED functionality
SMT
Parametrization
PST
Create single line diagram
for local HMI
GDE
IEC 61850
Export
SCD
CCT600
CMT
or
ACT
IET600
Import
SCD
SMT
IED
Write configuration to IED
WRITE
End
Relay engineering process
Export SCL files from
PCM600
Import SCL files to CCT600
or IET600 and do signal
engineering. Export updated
SCL files from CCT600 or
IET600.
Import SCL files to PCM600
Make GOOSE connections
Section 2
21

Advertisement

Table of Contents
loading

Table of Contents