Linking Process Objects - ABB RELION 615 Series Engineering Manual

Hide thumbs Also See for RELION 615 Series:
Table of Contents

Advertisement

1MAC108982-MB E
6.1.2.1
615 series ANSI
Engineering Manual

Linking process objects

To describe a process object within an IED, it needs to be established in the application
configuration, configured when given the parameters by the Parameter Setting tool and
linked to be displayed in the HMI.
Three tools are involved in the described steps.
Application Configuration tool for programming the application function block for
the apparatus and measurements
Parameter Setting tool for adapting the settings and configuration parameters of the
application function block
Graphical Display Editor for establishing the link to update the selected data attribute
in the HMI of the application function block
The needed information is delivered with switch controller (of type CSWI) for an
apparatus and all the configured function blocks with measurements (of type MMXU) for
the measurements
1.
Right-click the apparatus symbol and select Select Input Signal.
A list of engineered switch control application function blocks opens.
2.
Select the switch control application function block that corresponds to the selected
apparatus.
3.
Right-click the measurement symbol and select Select Input Signal.
A list of the engineered measurement application function blocks opens.
4.
Select the measurement application function block that corresponds to the selected
symbol.
Section 6
LHMI engineering
117

Advertisement

Table of Contents
loading

Table of Contents