Siemens SENTRON PAC4200 Manual page 93

Power monitoring device
Hide thumbs Also See for SENTRON PAC4200:
Table of Contents

Advertisement

Parameterizing
7.2 Parameterizing via the user interface
Voltage input
Selection
Connection type
Use PTs?
Measuring voltage
PT PRIMARY
(provided Use PTs?
PT SECONDARY
(provided Use PTs?
92
Range
3P4W
3 phases, 4 conductors, unbalanced load
3P3W
3 phases, 3 conductors, unbalanced load
3P4WB
3 phases, 4 conductors, balanced load
3P3WB
3 phases, 3 conductors, unbalanced load
1P2W
1 phase, 2 conductors, unbalanced load
ON: Measurement using voltage transformers.
When measuring via voltage transformer, the device must know the
voltage transformation ratio. For this purpose, the primary and sec-
ondary voltages must be specified in the fields "PT PRIMARY" and
"PT SECONDARY".
When changing from direct measurement to measurement using volt-
age transformers, the device accepts the last set reference measuring
voltage as the secondary voltage and as the primary voltage.
OFF: Measurement directly on the low-voltage system.
When changing from measurement using voltage transformers to di-
rect measurement, the device accepts the last set secondary voltage
as the reference measuring voltage.
1 V ... 690 V, freely adjustable (max. 600 V for UL)
1 V ... 500 V, freely adjustable (PAC4200 with extra-low voltage sup-
ply unit)
1 V ... 999999 V, freely adjustable
ON)
1 V ... 690 V, freely adjustable (max. 600 V for UL)
ON)
1 V ... 500 V, freely adjustable (PAC4200 with extra-low voltage sup-
ply unit)
Factory setting
3P4W
400 V
System Manual, 05/2019, A5E02316180B-05
OFF
400 V
289 V
400 V
289 V
PAC4200

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents