Clearance dimensions
Figure 10-4
Clearances
Figure 10-5
The clearances specified must be maintained for cable outlets and ventilation.
PAC4200
System Manual, 05/2019, A5E02316180B-05
Side-by-side installation
Clearances, device with screw terminal (on the left), device with ring lug terminal (on the
right)
Dimensional drawings
143