Point 3 - palintest Macro 900 Operation Manual

Water quality system
Table of Contents

Advertisement

Macro 900 Operation Manual
7. The screen will change to:
Calibration point 1 (Pt-1) is the warm 0.5ppm point. Calibration point 2
(Pt-2) is the warm 5ppm point. Calibration point 3 (Pt-3) is the cool
0.5ppm point.
The dates shown to the right of each point are the dates of the last
successful calibration.
8. Select Pt-1. The screen will change to:
The Meter will wait until the readings are stable, then it will send the calibration
command to the Probe, where the calibration takes place. During calibration,
the Calibrating screen is displayed and the progress counter counts up. If the
calibration is successful, the counter will reach 100% and the following screen
will be displayed.
The Calibration Report on the top line displays the voltage output from the ISE
electrode in millivolts (mV). This value is not stored in memory so should be
noted down in a calibration record book for the probe along with the
temperature.
Point 2
1. Remove the probe from the 0.5ppm solution and wash thoroughly in
deionised water. Dry the probe then drop it into to the warm 5ppm
solution.
2. Stir the probe until the temperature and F readings are completely stable.
A minimum of five minutes is recommended.
3. Ensure the temperature of the solution is within 1ºC of the
previous 0.5ppm calibration point. If the solution is warmer or cooler
than this, calibration will fail.
4. Referring to steps 4-7 above, select Pt-2 and press OK.
The Meter will wait until the readings are stable, then it will send the calibration
© 2013 Palintest Ltd.
CALIBRATE F
Pt-1? [01/Jan/12]
Pt-2? [01/Jan/12]
Pt-3? [01/Jan/12]
PLEASE WAIT
Stabilising
000%
Output:348mV
Calibrating
100%
Press [OK]
www.palintest.com
V3
Page 116 of 147

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents