Linking Process Objects - ABB Relion 630 Series Engineering Manual

Hide thumbs Also See for Relion 630 Series:
Table of Contents

Advertisement

1MRS756800 F
6.2.3.2
630 series
Engineering Manual
4.
Link the apparatus symbols with line elements.
5.
Adjust the text symbols while writing to north, east, south or west. Use the object
property window to do it.
6.
Place measurements when needed.
7.
Edit the name, unit and number of decimals of the measurements.
8.
Select each object that has a dynamic link and create the link to the
corresponding process object.
9.
Check to select the correct function block. Function blocks of the same type can
have different instance numbers.
10. Validate that all links are done.
11. Save the complete picture.
12. Repeat the steps for all pages when more than one is needed.
13. Write the display configuration to IED from the GDE tool.
GUID-11C787C2-BA45-4F98-8B92-2AE3294EC15E V1 EN
Figure 71:
GDE: Establish a dynamic object link

Linking process objects

To describe a process object within an IED it needs to be established in the application
configuration, configured when given with its parameters by PST and linked to be
displayed in the HMI.
Three tools are needed in linking.
Section 6
Local HMI engineering
IEC09000666-1-en.vsd
97

Advertisement

Table of Contents
loading

Table of Contents