112
tool configuration is changed, but no changes are done for the instantiation or deletion
of functions that represent a logical node.
When a changed configuration is written to the IED, the user is asked to update the
communication configuration.
1.
Select Yes in the Update Communication window to update the
communication configuration part in the IED.
2.
Select No in the Update Communication window to keep the communication
configuration part in the IED. Other parts of the configuration will be updated.
If no changes have been done in the communication
configuration part, click No in the Update Communication
window.
IEC09000729 V2 EN
Figure 85:
Updating the communication configuration in the IED with the
configuration made in PCM600

IET600 engineering

After the IED configurations are prepared in PCM600, IEC 61850 communication is
engineered in an IEC 61850 system configuration tool, where the substation section
part, horizontal GOOSE communication and connections between IEDs and event
reporting clients (SCADA, gateway) can be configured.
In PCM600 Ver. 2.4 or later the recommended IEC 61850 system configuration tool is
IET600, which is also included in the PCM600 Engineering Pro package. See IET600
documentation for more detailed description of the features.

Managing projects

Create a new project.
IEC09000729-2-en.vsd
1MRS756800 F