Section 4
Setting up a project
4.6
32
IEC09000360 V1 EN
Figure 8:
PCM600: IEC 61850 signal designation concept
Figure 8
shows the IED named in the example TR_421 in the object properties with
the two designations TR_421 and SB1.

Inserting IEDs

The context menu or the Object Types view shows the available 630 series IEDs
possible to insert, on the bay level in the plant structure, according to the installed
connectivity package.
Different actions are possible on the bay level in the plant structure.
Insert an IED in the offline mode or in the online mode.