Operation and Setting
6.2.5.2
1
2
3
4
optoCONTROL CLS-K
Linearization
Based on the basic function the linear part of the function is prepared with P3 "zero point" and P2
"steepness".
This adjustment requires repetitions as the settings of the potentiometer interfere each other.
A multimeter 0 – 10 VDC is connected to the measuring points "GND" and "U", see
(S2: "2"; 10 V = 20 mA) for the adjustment procedure.
Start value for zero point approximately – 2 V.
Fig.
16, see
Fig. 17
Page 32
Need help?
Do you have a question about the optoCONTROL CLS-K-10 and is the answer not in the manual?