RA8000 and ESA12000 Storage Subsystems
Tables
Table 2-2 Installing Rails for the Upper BA370 ........................................................... 2-18
Table 2-3 Installing Rails for the Lower BA370 ........................................................... 2-18
Table 2-5 Expansion Enclosure Address Combinations ............................................... 2-28
Table 3-2 Temperature Set Point Rules - EMU Firmware Vers. 1.0 and 1.1................... 3-3
Table 3-3 Temperature Set Point Rules - EMU Firmware Vers. 1.2 and 1.3................... 3-4
Table 4-5 Storage SBB Status LED Conditions ............................................................ 4-17
Table 4-7 Power Supply SBB Status LED Conditions .................................................. 4-18
xii
387404-001
EK-SMCPR-UG. A01
Need help?
Do you have a question about the RA8000 and is the answer not in the manual?