Running the demonstration
Figure 73. Humidity calibration 2
The humidity measure is displayed on the TFT-LCD. The figure below shows an
example of the message displayed by humdity measure subdemonstration on the TFT-
LCD.
Figure 74. Humidity measurement
1. To run the calibration phase again, power-off the evaluation board and set the jumper JP16 in VDD
position. If jumper JP16 is fitted in BAT position, the calibration phase is executed only once.
56/65
Doc ID 023892 Rev 1
UM1590
Need help?
Do you have a question about the STM32303C-EVAL and is the answer not in the manual?
Questions and answers