9.2.4
Configuring Power Control
For a control value to be assigned, at least one active rule must be defined
for every controlling procedure selected.
Define data logger as the master
1.
Configure communication with slaves:
2.
- do not use any slaves. See section 6.6 Power requirements
configuration Fig. 13
- Broadcast message to all slaves of the system. See section 6.6 Power
requirements configuration Fig. 14
- Define list with slaves. See section 6.6 Power requirements
configuration Fig. 15.
- state slave group. See section 6.6 Power requirements configuration
Fig. 16
Select reactive power procedure
3.
Note:
Define parameters for the power procedures in accordance with the
4.
requirements
Active rule is defined.
If no active rule is assigned to the reactive power procedure, the fallback
case applies. See section 7.3 Details fallback operation.
9.3
Power Control system control circuit GCP control
-
The power quality analyser is configured as Modbus device type in
WEB`log.
-
The transformer nominal output configuration parameter is entered for
the system control circuit
-
The start configuration for the control is created
See section 8 System control circuit.
9.4
Enabling Power Control
Do not enable Power Control until all requirements for the Power Control
have been fully defined and configured.
9.5
Performing test run (optional)
If it is ensured that Power Control was implemented in accordance with the
requirements, a test run should be performed in the system.
60/78
If no Q or cos φ rule is required, "-none-" must be selected as
the reactive power procedure.