Power Requirements Configuration - meteocontrol Power Control Operating Manual

Table of Contents

Advertisement

Fig. 12: Power Control online values
Description
Operating status
Active power process
Reactive power process
Current control value
Note:
6.6

Power requirements configuration

The configuration of the Power Control is retrieved via the "Admin
Monitoring" menu item and displays the selection of the procedures for
control value distribution.
Fig. 13: WEB`log master without slaves
meteocontrol Power Control 03082012 - en
Meaning
Active
Displays the current procedure: P(DI)
Displays the current procedure: cosφ(DI)
Control value requirement for active and
reactive power procedures in per cent
The highlighted values are updated every 10 seconds. It is
not possible to configure the online values.
27/78

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power Control and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents