Front view
No.
Name & Function
1 ~ 2
HDD1/HDD0
3
Handle
4
Reset button
Power button/indicator
Off: the compute node is not powered on;
5
Steady green: the compute node is powered on normally;
Blinking yellow: the power of computer node is in lock state for the moment, or
there is a power problem, it fails to power on.
UID button/indicator:
Used to locate the compute node in the rack;
ON/OFF: controlled through SMC remotely or manual operation.
6
Off: BMC initialization is complete or the compute node is not located;
Blinking blue: BMC initializing. The compute node's BMC detects it has been
inserted and is building communication with SMC;
Steady blue: the compute node is located.
Status indicator
7
Off: the compute node is normal;
Blinking yellow: there is a critical alarm.
8 ~ 9
USB3.0 port
10
VGA

2.3 Usage of NX5460M4 Blade Server

NX5460M4 blade server must be used together with Inspur I9000 server; it can be used
only after being installed in I9000 server system. About how to install NX5460M4 into I9000
server, please refer to the relevant section in I9000 server user manual or the installation
diagram on the host chassis of I9000 blade server, it will not be repeated here.
Product Overview