2.1
Unpacking the Analyzer
Unpack carefully as follows:
a.
Remove the accessories (if ordered).
b.
If no accessories have been ordered the delivery should contain following
items:
•
Promet I.S. control unit
•
Promet I.S. sensor assembly (if a sampling system has been
ordered the sensor assembly should already be mounted in the
sampling system)
•
User manual
•
Certifi cates of calibration and conformity
•
Power lead (only for 85 to 265 V AC version)
c.
Remove the Promet I.S. sensor assembly from the box.
d.
Lift out the control unit together with its end packing pieces.
e.
Remove the end packing pieces and set the control unit down at the site
of installation. Save all the packing materials for the purpose of returning
the instrument to the manufacturer for service.
If ordered, the Promet I.S. Premium Sampling System will be shipped in a separate box.
Michell Instruments
It is essential that the installation of the electrical and gas
supplies to this analyzer be undertaken by suitably qualifi ed
personnel.