Validating The Hwbb Function - YASKAWA SERVOPACK Sigma 7W Series Product Manual

Hide thumbs Also See for SERVOPACK Sigma 7W Series:
Table of Contents

Advertisement

5.5

Validating the HWBB Function

When you commission the system or perform maintenance or SERVOPACK replacement, you
must always perform the following validation test on the HWBB function after completing the
wiring. (It is recommended that you keep the confirmation results as a record.)
• When the /HWBB1 and /HWBB2 signals turn OFF, confirm that the Digital Operator displays
Hbb and that the Servomotors do not operate for axis A and axis B.
• Monitor the ON/OFF status of the /HWBB1 and /HWBB2 signals.
If the ON/OFF status of the signals do not coincide with the display, the following must be
considered: an error in the external device, disconnection of the external wiring, short-circuit-
ing in the external wiring, or a failure in the SERVOPACK. Find the cause and correct the
problem.
Refer to the following manual for your SERVOPACK for details on the monitor.
Σ-7-Series Σ-7W SERVOPACK with MECHATROLINK-III Communications References Product Manual (Manual
No.: SIEP S800001 29)
Σ-7-Series Σ-7C SERVOPACK Product Manual (Manual No.: SIEP S800002 04)
• Confirm that the EDM1 signal is OFF while in normal operation by using the feedback circuit
input display of the connected device.

5.5 Validating the HWBB Function

5
5-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents