Suzuki Wagon R Manual page 3192

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

3
"a"
(a)
4
On-Vehicle Service
Accelerator cable adjustment
With accelerator pedal depressed fully (1), check clearance
between throttle lever (2) and lever stopper (3) of throttle body.
2
If measured value is out of specification, adjust it to specification
with cable adjusting nut (4).
Accelerator cable adjustment clearance (with pedal
depressed fully)
"a": 0.5 – 2.0 mm (0.02 – 0.07 in.)
Tightening torque
Accelerator cable lock nut (a): 12 N·m (1.2 kg-m, 9.0 lb-ft)
1
Idle speed/idle air control (IAC) duty inspection
Before idle speed/IAC duty check, make sure of the following.
• Lead wires and hoses of Electronic Fuel Injection and engine
• Accelerator cable has some play, that is, it is not tight.
• Valve lash is checked according to maintenance schedule.
• Ignition timing is within specification.
• All accessories (wipers, heater, lights, A/C, etc.) are out of
• Air cleaner has been properly installed and is in good condi-
• No abnormal air inhaling from air intake system.
After above items are all confirmed, check idle speed and IAC
duty as follows.
NOTE:
Before starting engine, place transmission gear shift
lever in "Neutral" (shift selector lever to "P" range for A/T
vehicle), and set parking brake and block drive wheels.
ENGINE AND EMISSION CONTROL SYSTEM (M13 ENGINE) 6E2-15
emission control systems are connected securely.
service.
tion.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents