Using Step 5 To Diagnose Problems (Station Diagnostics) - Siemens SIMATIC ET 200C Manual

Table of Contents

Advertisement

Fault Diagnostics with the IM 308-C
8.2

Using STEP 5 to Diagnose Problems (Station Diagnostics)

Introduction
You can use STEP 5 for the systematic pinpointing and diagnosis of faults.
STEP 5
The table below lists the STEP 5 diagnostics facilities for operation with
Diagnostics
IM 308-C:
Facilities
Table 8-5
In this Section
Master diagnostics with IM 308-C is dependent on the station type of the
slaves. It is described in detail in the manual entitled ET200 Distributed
I/O System (Order No. 6ES5 998-3ES12).
This section describes station diagnostics with ET 200C.
8-6
STEP 5 Diagnostics Facilities, Operation with IM 308-C
Diagnostics
Master diagnostics
Registers all slaves for which diagnostics
messages are pending.
Registers all slaves with which data trans-
fer has taken place within a certain time
window
Provides information on the operating
mode of the DP master
Station diagnostics
Provides information on status of the slave
and outputs diagnostics for channel groups
(modules with diagnostics capability only)
Content
ET 200C Distributed I/O Station
EWA 4NEB 812 6119-02b

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents