SawStop RT-TGI Owner's Manual page 29

Industrial in-line router table
Table of Contents

Advertisement

Next, mount the router table to the
3
rails using the hardware from the "Rail
Mounting Hardware" bag from your
Power Switch (RT-PSW) box. Insert
two M8 flat head socket screws (3.17)
through the holes in the front rail and
router table. Secure the screws with two
M8 washers (3.18), two M8 lock washers
(3.19), and two M8 hex nuts (3.20).
Only finger tighten the nuts at this time.
Repeat this process for the holes in the
rear rail and rear edge of the router table.
Lay a straight edge across the front
4
of the right extension wing so that
it extends over the top of the router
table as well. Make sure the router
table is flush with the top of the right
extension wing and then use a 5mm
hex wrench and a 13mm wrench to
tighten the screws (3.17) and hex nuts
(3.20) attaching the router table to the
front rail. Repeat this process at the
rear edge of the router table and right
extension wing.
Adjust the feet in the support legs until
5
they contact the ground and keep the
cast iron table level. Then use a 13mm
wrench to tighten the M8 hex nuts (2.2)
up against the bottoms of the
support legs.
Follow the instructions in your table saw fence manual to reinstall the main tube
6
and retighten the hardware securing your front and rear rail to your table saw. See
your table saw fence manual for further information.
Congratulations! You have completed the In-Line Installation Right: Between 36" Rails section.
Continue to page 31 for next steps.
3.17
3.18
3.19
3.18
3.19
3.20
2.2
RT-TGI OWNER'S MANUAL
3.20
3.17
24

Advertisement

Table of Contents
loading

Table of Contents