Power Switch for In-Line Router Tables (RT-PSW)
A.
In-Line Switch Box Mounting Bracket
Assembly (1)
B.
Handle Mounting Bracket (1)
C.
Leg Mounting Bracket (1)
D.
Leg Mounting Hardware Pack (1)
• M10 x 1.5 x 45 Hex Head Bolt (4)
• M10 x 19 x 2 Washer (8)
• M10 x 1.5 Lock Nut (4)
• M6 Lock Washer (4)
• M6 x 1.0 x 12 Socket Head Cap Screw (4)
• M5 x 0.8 x 30 Pan Head Phillips Screw (1)
• M5 Lock Washer (2)
• M5 x 12 x 1 Washer (2)
• M5 x 0.8 x 8 Pan Head Phillips Screw (1)
C
You will also need the following tools to complete the Power Switch:
•
Phillips Head Screwdriver
•
16mm Wrench (x2)
•
13mm Wrench (x2)
See Exploded View #3 on page 43 for more information.
A
B
D
•
5mm Hex Wrench
•
Level or Straight Edge
E.
Wing Mounting Hardware Pack (1)
• M8 x 1.25 x 45 Hex Head Bolt (4)
• M8 x 19 x 2 Washer (8)
• M8 Lock Washer (4)
• M8 x 1.25 x 12 Hex Nut (4)
F.
Rail Mounting Hardware Pack (1)
• M8 x 1.25 x 25 Flat Head Socket
Screw (4)
• M8 x 19 x 2 Washer (4)
• M8 Lock Washer (4)
• M8 x 1.25 x 12 Hex Nut (4)
F
RT-TGI OWNER'S MANUAL
E
8