Metal Junction Box Or Mud Ring Installation; Mounting Surface Preparation - Extron electronics XTP R HWP 201 User Manual

Xtp receiver – decorator-style wallplate
Hide thumbs Also See for XTP R HWP 201:
Table of Contents

Advertisement

2.
3.
4.
5.
6.
7.

Metal Junction Box or Mud Ring Installation

Mounting Surface Preparation

1.
2.
3.
4.
5.
Cut a hole in the mounting surface (see
Install the mud ring or metal junction box in the mounting surface (see
Installation
on the next page or
page 7).
Route and connect cables to the rear and side panel connectors (see
Panel Connectors
on page 8).
Mount the XTP R HWP 201 to the mud ring or metal junction box (see
XTP R HWP 201
on page 9).
Connect inputs to the front panel connectors (see
page 10).
Supply power to all connected devices.
Using an appropriate template or the mounting enclosure as a guide, mark the area
of the wall that will be cut with a soft pencil (for the provided mud ring, see
Template
on page 32).
NOTES:
If using a junction box, use a UL Listed metal one only.
Check with the manufacturer of the metal junction box for specific installation
requirements.
Install junction boxes against wall studs.
Use a jigsaw or small hand saw to carefully cut away the material within the guidelines
drawn in step 1.
NOTE: If using a template or the mud ring as a guide for cutting the hole in drywall,
cut inside the guidelines to maximize the contact between the mud ring and
drywall.
If using a mud ring in a wall with insulation inside, remove at least 6 inches of the
insulation in all directions around the cutout.
NOTE: If a wall stud interferes with removing 6 inches of insulation around the
cutout, remove the insulation between the cutout and wall stud.
Check the size of the opening by laying the mud ring or metal junction box against it.
The mounting device should fit snugly in the opening.
If needed, use a saw, file, or sandpaper to enlarge the hole.
CAUTION: Risk of personal injury. Smooth the edges of the opening to avoid
personal injury during installation.
ATTENTION : Risque de blessure. Lissez les bords de l'ouverture afin d'éviter
toute blessure lors de l'installation.
ATTENTION:
Smooth the edges of the opening to avoid damage to the mounting device or
the cables.
Lissez les bords de l'ouverture afin d'éviter d'endommager l'appareil de
montage ou les câbles.
Mounting Surface Preparation
UL Listed Metal Junction Box Installation
Front Panel Connections
XTP R HWP 201 Wallplate Receiver • Installation
below).
Mud Ring
on
Rear and Side
Mounting the
on
Mounting
5

Advertisement

Table of Contents
loading

Table of Contents