Fujitsu PRIMERGY RX800 S2 Operating Manual page 59

Hide thumbs Also See for PRIMERGY RX800 S2:
Table of Contents

Advertisement

Preparation for Operation
If the server is installed in a multi-node configuration, pressing the power
button on the primary node in the partition will start an orderly shutdown of
the operating system and turn off the server.
The server can be turned off from the RSA-II user interface (see the RSA-II
user manual for more details).
If the Wake on LAN feature turned on the server, the Wake on LAN feature
can turn off the server.
You can turn off the server through a request from the service processor.
After you turn off the server, wait at least 5 seconds before you turn on
i
the server again.
U41621-J-Z156-1-76
Switching the Server On and Off
53

Advertisement

Table of Contents
loading

Table of Contents