Fujitsu PRIMERGY RX800 S2 Operating Manual page 45

Hide thumbs Also See for PRIMERGY RX800 S2:
Table of Contents

Advertisement

Installing the Server
Figure 11: Cabling two nodes
Ê Connect the SMP Expansion cables to node 1:
Ê Connect one end of an SMP Expansion cable to port 1 on node 1; then,
route the cable through the node 1 cable-management arm. Use a 2.3-
m (7.6-foot) SMP Expansion cable for this connection.
Ê Connect one end of an SMP Expansion cable to port 2 on node 1; then,
route the cable through the node 1 cable-management arm. Use a 2.3-
m (7.6-foot) SMP Expansion cable for this connection.
Ê Connect the SMP Expansion cables to node 2:
Ê Locate the SMP Expansion cable that is connected to port 1 on node 1;
then, connect the opposite end of the cable to port 1 of node 2. Next,
route the cable through the node 2 cable-management arm.
Ê Locate the SMP Expansion cable that is connected to port 2 on node 1;
then, connect the opposite end of the cable to port 2 of node 2. Next,
route the cable through the node 2 cable-management arm.
Ê Route any remaining cables through the cable-management arms.
U41621-J-Z156-1-76
Connecting and Disconnecting Cables
39

Advertisement

Table of Contents
loading

Table of Contents