info@Testo-Direct.com
>
[
]
→
Measurement options
> Select the fuel → [OK].
Carrying out the measurement:
1. Start the measurement series:
Wait for the balancing time, until O
20%.
2. [Next].
-
The qA measured values (O
-
The measurement stops automatically.
-
The measured values are displayed and saved automatically in
a record.
3. End measurement:
or
End measurement and call up draught measurement function:
[Draught
- Measuring].
Options:
>
[Options]
→ Clipboard: data is saved to the clipboard.
[Options]
>
→
is deleted.
>
[Options]
→ Save: the measured values are saved in a record.
>
[Options]
→ Address/Location: the Address/Location folder is
opened.
4.
6.2.7.
CO undiluted
Call up function:
✓ A multi-hole probe (0554 5762) should be connected.
>
[
]
→
Measurement options
[OK].
Carrying out the measurement:
1. Start measurement:
-
The measured value is displayed.
2. End measurement:
Options:
[Options]
→ Clipboard: data is saved to the clipboard.
>
>
[Options]
→
is deleted.
www.
→
[OK]
→
[
]
shows a value below
2
, AT, VT) are determined (30 s).
2
[Close]
Delete
clipboard: any data saved to the clipboard
→
[OK]
→
[
]
[
]
Delete
clipboard: any data saved to the clipboard
Testo-Direct
6 Using the product
BImSchV
→ [OK].
CO undiluted
→
51
1.888.610.7664
.com