Commissioning - Triton T300si Installation And Operating Instructions Manual

Wireless remote electric shower
Table of Contents

Advertisement

T300si wireless remote electric shower

COMMISSIONING

Fig.68
Setting up the remote pack
Press the START/STOP button. The 'HIGH' and
'POWER ON' indicators will light for a few
seconds and after a short delay water will begin
to flow.
It will take about thirty seconds for a smooth flow
of water to be obtained while air and any debris
in the system is being flushed from the shower.
Note: During the commissioning procedure
the low pressure indicator will flash every half
second.
Once the flushing procedure is complete press
the START/STOP button. The 'POWER ON'
indicator will light up and the shower will go
into the phased shutdown procedure. Once
complete, the light will extinguish and water will
cease to flow.
Switch off the electricity supply to the shower at
the isolating switch.
Purge pin procedure
On the remote pack, undo the top and bottom
screws and remove the cover. Inside the remote
pack, on the PCB, is the purge pin (Fig.68). Pull
the purge pin off its two pins and, in order for it
to be used at a later date, replace it onto one of
the pins.
Refit the cover and secure with the three screws.
Turn on the electricity supply at the isolating
switch and then turn on fully the water supply.
Once the installation of the riser rail is complete
Fig.69
the shower is ready for normal operation.
Setting the timed operation
At this stage the setting between continuous and
timed operation of the shower can be selected.
In the control panel battery compartment is
a switch (Fig.69). Changing the switch from
continuous operation to timed operation will set
up the shower so that once started, it will run for
a maximum of ten minutes before automatically
shutting down.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents