COMMISSIONING

Start the water flow by rotating the flow control.
Make sure that the hot and cold water supplies
are fully open and at, or near to, their design
temperature and pressures and are within the
requirements stated in the Site Requirements.
Make sure the temperature control is at the
maximum temperature setting WITHOUT
operating the maximum temperature override
button.
Allow the shower to run at this maximum
temperature setting until the water temperature
has stabilised.
Rotate the temperature control until your desired
showering temperature is reached.
IMPORTANT
The temperature adjustment range must be
checked to guarantee user safety.
Rotate the temperature control checking
the minimum and maximum showering
temperatatures; ADJUST THE MAXIMUM
TEMPERATURE STOP SETTING if required.
The following is recommended for domestic
installations but must be carried out for
commercial installaions: Check the thermal shut
off facility of the mixer shower by performing a
thermal shut off test.
Shut off the cold supply. The flow from the mixer
shower should stop immediately or reduce to
a trickle in which case the water temperature
should be less than 43°C. In either case, there is
no risk of scalding.
If, however, the temperature is above 43°C then
it is likely there is contamination in the mixer
shower stopping it from shutting off the hot
supply. In this case refer to the maintenance
section or contact Triton Customer Experience.