Triton T300si Installation And Operating Instructions Manual page 31

Wireless remote electric shower
Table of Contents

Advertisement

Mark the centre hole position for the bridging
bracket and remove the assembly. Drill and plug
the wall.
Secure temporarily the guide bracket (and spacer,
if used) to the bridging bracket mounting point.
Fit the bottom bracket to the riser rail and slide
the rail section up through the guide bracket
until it touches the ceiling (Fig.47). Align the rail
vertically. Mark the centre hole position of the rail
on the ceiling. Remove the rail section and the
guide bracket and, using a 26 mm hole cutter,
drill the ceiling opening.
Fit the bridging bracket (and spacer, if used) to
the wall, making sure the small lug inside the
bracket faces down.
Measure the 940 mm rail (for the upper section of
rail) and mark the required length to fit between
the bridging bracket and into the ceiling.
Remember to add the extra length of rail onto
the measurements to clear any obstructions
above the ceiling level (Fig.46). Cut the riser rail
to length and deburr.
If the upper rail section is sufficiently long, fix the
guide bracket (and spacer, if used) onto the wall
for additional support (Fig.46).
Feed the cut upper riser rail though the guide
bracket (if used) before sliding the ceiling trim
down onto the rail. Slide the riser rail into the
ceiling opening and drop back into the bridging
bracket, with the smaller of the cut-outs facing
towards the rear. Secure the rail to the bridging
bracket using the small screw supplied (Fig.48).
Slide the ceiling trim up to the ceiling.
Fit the 700 mm riser rail into the bottom bracket
with the smaller cut-outs facing towards the rear
and secure with the small screw supplied.
IMPORTANT: Before securing the rail, test fit
the outlet connector and clip to make sure it
will fit into the bottom bracket with the rail
in place.
Fit the lower riser rail assembly into the base
of the bridging bracket, making sure the small
cut-out engages the bracket lug. Using a spirit
level, align the riser rail vertically and mark the
bottom bracket centre hole position. Remove the
assembly. Drill and plug the wall.
T300si wireless remote electric shower
29
Mark the
position where
rail enters
the ceiling
Guide bracket
Riser rail
Upper
riser rail
section
Retaining
screw
Fig.47
Fig.48
Smaller cut-out
to rear
Bridging
bracket

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents