Commissioning Procedure - Triton Amala SFXAMA08BLK Installation And Operating Instructions Manual

Electric shower
Table of Contents

Advertisement

Electric shower

COMMISSIONING PROCEDURE

Fig.15
WARNING
Before normal operation of the shower, it
is essential the following commissioning
procedure is completed correctly.
The first operation of the shower is intended
to flush out any remaining unit debris and
to make sure the heater unit contains water
before the elements are switched on.
This operation MUST be carried out WITH the
hose screwed to the outlet but WITHOUT THE
SHOWER HEAD ATTACHED.
Temperature flow
Ensure the outlet of the hose is directed to
control set at
waste.
maximum flow
IMPORTANT: The valve spindle (fig.13) and
the temperature flow control (fig.14) MUST be
turned fully clockwise to the minimum flow
position - failure to do this could cause
the PRD to operate.
Ensure the water supply to the shower is turned
on at the isolating stopvalve.
Switch on the electricity supply to the shower at
the isolating switch.
Once water starts to flow from the hose, slowly
rotate the temperature control fully anti-
.
clockwise (fig.15)
It will take about thirty seconds for a smooth
flow of water to be obtained while air and any
debris is being flushed from the shower
When a smooth flow of water is obtained, turn
the temperature control fully clockwise and anti-
clockwise and back again several times to release
any trapped air from within the unit.
Once the flushing out has been completed,
switch off the electricity to the shower at the
isolating switch. The water will cease to flow.
Unscrew the top and bottom retaining screws
again and lift the cover from the backplate.
NOTE: The screws do not need to be completely
removed to be able to remove the cover.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents