COMMISSIONING

WARNING!
Before normal operation of the
shower, it is essential the following
commissioning procedure is
completed correctly.
The first operation of the shower is intended
to flush out any unit debris and to guarantee
that the heater unit contains water before the
elements are switched on. This operation must
be carried out with the electricity switched
OFF at the isolating switch and WITHOUT the
shower head attached to the flexible hose. Make
sure the outlet of the hose is directed to waste.
Check the water supply is turned OFF at the
isolating stopvalve.
Rotate the temperature control fully anti-
clockwise to number 10, the minimum flow
position (fig.17).
NOTE: Leaving the control at any position other
than 10 may cause the PRD to operate.
Turn the water supply back ON at the isolating
stopvalve.
Wait until water starts to flow from the flexible
hose, then slowly rotate the temperature control
clockwise to number 1, the maximum flow
position (fig.18).
It will take approximately thirty seconds for a
smooth flow of water to be obtained whilst
air and any debris is being dispersed from
the shower. When a smooth flow of water is
obtained, rotate the temperature control from 1
to 10 and back again several times to release any
trapped air within the unit.
Once the flushing out has been completed,
stop the water flow by rotating the temperature
control fully clockwise to the STOP position.
Fit the shower head to the flexible hose and
place in the holder.
Switch on the electricity supply to the shower at
the isolating switch.
The shower is now ready for normal operation.
T60X
COVER RETAINING SCREWS
ONLY the SUPPLIED SCREWS should be
used. The use of non supplied screws WILL
invalidate product specifications & warranty.