COMMISSIONING
Before using the ENVi
IMPORTANT: It is recommended that during the commissioning procedure the
outlet connections and plumbing are checked for any water leakage.
You may need help from an additional person to assist in this process.
Resolve any leaks or plumbing issues, and after fixing, repeat the commissioning
process to be confident that the pipework and water connections do not have any
Step
Step
1
The ENVi
and fixed head options, always ensure that any fixed head or shower head is removed for
commissioning. Attach the appropriate end of the shower hose (if supplied) to the shower
outlet using the supplied hose washer seal - DO NOT overtighten.
Position the other end of the shower hose to the bath or tray waste.
Step
Step
2
Ensure the electricity and water supplies to Tri-HUB are ON, and the Data Cable is
connected to both the ENVi
of this book. When the Start/Stop
TRITON logo will appear briefly, this will then be replaced with the instructions to start the
shower system, final checks and commissioning must be undertaken.
®
Please follow the steps below.
shower system can be purchased with a variety of different shower kits
®
Controller and Tri-HUB as described in the installation sections
®
commissioning process.
ENVi
SHOWER SYSTEM
®
water leakage.
icon is illuminated, touch it to wake the shower. The
18