COMMISSIONING
WARNING
Fig.16
Before normal operation of the shower, it
is essential the following commissioning
procedure is completed correctly.

COMMISSIONING PROCEDURE

Open
The first operation of the shower is intended
to flush out any remaining unit debris and to
ensure the heater unit contains water before
Bleed screw
the elements are switched on.
This operation MUST be carried out WITH
the flexible hose screwed to the outlet but
WITHOUT THE SHOWER HEAD ATTACHED.
Ensure the outlet of the flexible hose is directed
to waste.
Prime the Pump
Fig.17
Ensure the electricity supply is isolated.
Ensure the water supply to the shower is turned
on.
Open the bleed screw on the pump unit by
rotating two revolutions (fig.16). When water
flows from the opening this indicates that any
trapped air is vented and that the pump unit is
primed. The bleed valve MUST now be closed
by rotating fully in the opposite direction.
Temporarily Fit the Cover
Ensure that the front cover has been fitted
correctly and temporarily secure in place with
two of the fixing screws supplied with the shower
unit (fig.17).
Fit the Shower Hose
Fig.18
Attach the appropriate end of the shower hose to
the shower outlet using the supplied hose washer
seal - DO NOT overtighten (fig.18).
Position the other end of the shower hose to the
bath or tray waste. DO NOT fit the shower head.
18