COMMISSIONING

Make sure that the electricity supply to the unit and isolating switch has been turned off
before proceeding.
Step
Step
Remove the front cover and disconnect the PCB cable from the rear cover PCB then remove
9-1
the right hand trimplate.
Turn the water supply to the unit on and turn the bleed screw approximately 3 turns out
Step
Step
- make sure that an absorbent cloth is in place to catch any purged water. Let the water
9-2
flow approximately 30-60 seconds until a steady stream of water flow with no bubbles
then re-tighten the bleed screw. Turn the water supply back off.