Commissioning - Triton Jade 3 Installation And Operating Instructions Manual

Electric shower
Table of Contents

Advertisement

COMMISSIONING

WarnInG!
Before normal operation of the
shower, it is essential the following
commissioning procedure is
completed correctly.
Important: the first operation of
the shower is intended to flush out any
remaining unit debris, and to make sure
the heater unit contains water before the
elements are switched on.
This operation must be carried out with
the flexible hose screwed to the outlet but
WITHOuT the showerhead attached.
The COLD position must be used. Make sure the
outlet from the flexible hose is directed to waste.
Before turning on the electric and mains water
supplies to the shower, check that the power
selector is in the COLD position (fig.) and
the temperature control is turned to position
'10', the minimum flow position (fig.).
note: Failure to turn the control to '10' may
cause the PRD to operate.
Turn on the electric and mains water supplies to
the shower.
Press the START/STOP button (fig.) and wait
until water starts to flow from the flexible hose.
Slowly turn the temperature control fully
anti-clockwise to '1', the maximum flow
position (fig.).
It will take about thirty seconds for a smooth
flow of water to be obtained while air and any
debris is being flushed from the shower.
When there is a smooth flow of water turn the
temperature control from '1' to '10' and back
again several times to release any trapped air
within the unit.
Once flushing out has been completed, stop the
water flow by pressing the START/STOP button.
Fit the showerhead to the flexible hose and
place in the showerhead holder.
The shower is now ready for normal operation.
Jade 3
Temperature
control at
minimum flow
setting

>POM-GF30<
Power
selector
to COLD
Start/Stop
button
Fig.0
WARNING
WARNING
Fig.

Advertisement

Table of Contents
loading

Table of Contents