NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm)
Figure 3-39 Connecting the power cable
(1) Power cable ports (connecting to L1, L2, L3, from left to right) (2) PE wiring terminal
3.11.3 Installing the Voltage Jumper
Before connecting the voltage jumper, ensure that the power distributor matches the mains
voltage.
Figure 3-40
voltage and connect the jumper to 11 in
Figure 3-40 Voltage jumpers
3.11.4 Connecting the Signal Cables
Issue 13 (2019-01-15)
shows six voltage jumpers. Select one jumper that matches the local power
Copyright © Huawei Technologies Co., Ltd.
Figure
A-1.
3 Installation Guide
65