Optional) Installing The Top Frame - Huawei NetCol5000-A User Manual

In-row air cooled smart cooling product, 600 mm
Hide thumbs Also See for NetCol5000-A:
Table of Contents

Advertisement

NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm)
Figure 3-35 Installing the top sealing plate
Step 6 Install the hinges and connecting plates removed in
the enclosure frame.
Step 7 Install the cabinet front door on the enclosure frame.
Step 8 Install the power cable for the display screen. Connect the ground cable under the front door
to the enclosure frame according to the label on the enclosure frame.
Step 9 After installing the enclosure frame, the power cable for the display screen may be not long
enough to open the door completely. Cut off the cable ties, which fastening the power cable,
to make sure the front door can rotate smoothly.
----End

3.10.2 (Optional) Installing the Top Frame

Bottom Pipe Routing
Step 1 Remove the two M5x10 tapping screws that secure the front door sealing plate on the top of
the cabinet, as shown by (1) in
Issue 13 (2019-01-15)
Figure
3-36.
Copyright © Huawei Technologies Co., Ltd.
3 Installation Guide
Step 2
on the corresponding positions on
61

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol5000-a025Netcol5000-a-035

Table of Contents