For easier access to stacking hardware, the top two screws on the front of
the relay box bracket may be removed (Figure 1-4). The relay box can be
pushed carefully back approximately an inch. The stacking hardware may
then be installed. When the stack has been secured, pull the relay box
forward and reinstall the two screws.
Figure 1-4. Remove Two Screws
To install a single unit, or the base unit for a stack of shakers on the floor,
first position the unit in its final location.
1. Install the neoprene pads onto each of the
leveling feet of the single (or base) unit.
2. Level the unit. Refer to the Leveling section.
To stack shakers onto a base unit on the floor, make sure the neoprene
pads are installed onto the leveling feet of the base unit.
1. Place the 1-1/2 inch tall spacers over the holes in
the top four corners of the base unit.
2. Remove the leveling feet from the second shaker.
3. Carefully lift and position the shaker over
the spacers on the base unit. Align the (4)
mounting holes in the bottom of the
shaker with the (4) spacers.
4. Thread the included 5/16"- 18 x 4" bolts
through the inserts, then the spacers, and
into the unit below. Tighten bolts.
5. Level the shaker/stack. Refer to the
Leveling section.
Section 1
Installation
Figure 1-5. Neoprene Pad
Figure 1-6. Spacer
bottom left corner
of shaker
lockwasher
flatwasher
4 in. bolt
1-1/2" spacer
top left corner
of base unit
Figure 1-7. Shaker to Shaker
Model SHKE8000 Series Shakers
1-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shke8000Shke8000-1ceShke8000-7Shke8000-8ce

Table of Contents